There's been a little progress on the outside. The concrete on the front and back porches has been poured. Some siding has been put on each side of the house. The driveway and sidewalks will not be poured until the water and sewer connections are in place and have passed inspection. That is the main hold-up right now. The builder had thought that the cabinets would be a delaying factor, but they are supposed to be installed later this week.

 

 